Saturday, 2 June 2012

Engines In !

Birdy and I took a trip to Selby on Thursday night to collect the engine from Roger at RMKD. Roger has worked his magic on the motor so we are hoping for good things. Today I have been busy putting the engine into the frame and sorting a few other bits and pieces out. I have to say the ER6 engines weigh a bloody ton and getting one into the frame on your own takes a fair bit of doing. You may be able to see in the pictures that we now have a quickshifter on the bike which plugs straight into the power commander so is an easy fitment. My next jobs on the list are fit injectors, airbox and airduct. Decide what radiator/oil cooler combination to use, finish the exhaust system, sort the wiring, rev counter and temp gauge, then the fairing. So I still have a few things to do!

0 comments:

Post a Comment

◄ Newer Post Older Post ►
 

Copyright 2011 Motorcycle Road Racing is proudly powered by blogger.com